Burndenet Creek Erosion Control Optimization Study

Type of initiative FCM Green Municipal Fund - Plans, Studies, Pilots
Sector Water
Project value$61,110
Project Type Feasibility Study
Sub Sector Watershed Management
Grant amount$30,555
Program type GMF
Municipality City of Markham, ON
Status Fully Disbursed
Population 338,503
Project timeline 2002 - 2011
Project number 2609

Description

Burndenet Creek, an environmentally sensitive waterway, is located in the Rouge River watershed. The five–kilometercreek is susceptible to erosion because of the urban development nearby. This study will investigate the extent of thecreek's susceptibility to erosion and will identify the most effective ways to minimize or control that erosion. Thosemethods could include source controls, retrofitting existing off–line storm water management facilities, using in–streamerosion control works, or devising a combination of all these possibilities. The study will use the most modern technicaltools available to model erosion. Minimizing erosion will protect adjacent properties from suffering the same fate, willreduce sediments in the water, provide better water quality and will protect the health of downstream aquatic andterrestrial resources.

Applicant

Town of Markham, ON