Lethbridge Integrated Biogas Solution

Type of initiative FCM Green Municipal Fund - Plans, Studies, Pilots
Sector Energy
Project value$40,000
Project Type Feasibility Study
Sub Sector Waste to Energy – Biomass
Grant amount$20,000
Program type GMF
Municipality Lethbridge County, AB
Status Fully Disbursed
Population 10,120
Project timeline 2004 - 2011
Project number 5538

Description

A detailed business case will be developed for a biogas plant, building on the results of GMEF 2800, which confirmed the feasibility of building and operating a demonstration project/pilot biogas plant with a treatment capacity of 270 tonnes per day. The demonstration project/pilot project will combine beef feedlot and municipal wastes from the area and mix it with wastewater from a large integrated hog enterprise. The materials will then be processed in an anaerobic digester where resulting purified CH4 will be used as fuel in a combined heat and power plant (CHP) to produce thermal and electrical energy. The pilot plant will use some of this energy with the remainder being sold for commercial use. In total, it is estimated that this project will result in a reduction of over 15 tonnes of CO2e/yr.

Applicant

Lethbridge County, AB