Project Type Project Type
Type of initiative Type of initiative
Sector
Province
{vProjStatusDisplayname}}
Project timeline Project timeline
  • to
Population Population
  • to
Project value Project value
  • to
Other

When you click through the individual search result, the database will also highlight the three other initiatives that most closely match your search parameters.

Results

2963 results found. Showing page 119
Type
MAMP Projects
Sector
Asset Management (MAMP)
Status
Fully Disbursed
Municipality
Town of Point Leamington, NL
Sub Sector
Multiple
Project Timeline
2019 - 2019
The Town of Point Leamington will capture all major assets (water distribution, sewer, storm wate...
Type
MAMP Projects
Sector
Asset Management (MAMP)
Status
Fully Disbursed
Municipality
Town of Plympton-Wyoming, ON
Sub Sector
Multiple
Project Timeline
2019 - 2020
The town of Plympton-Wyoming will obtain building component details and condition data, refine th...
Type
MAMP Projects
Sector
Asset Management (MAMP)
Status
Fully Disbursed
Municipality
Municipality of Bifrost-Riverton, MB
Sub Sector
Multiple
Project Timeline
2018 - 2019
The Municipality of Bifrost-Riverton will create a Strategic Asset Management (AM) Framework to i...
Type
MAMP Projects
Sector
Asset Management (MAMP)
Status
Fully Disbursed
Municipality
Town of Hinton, AB
Sub Sector
Asset Management Plans, Policy and Strategy
Project Timeline
2018 - 2020
The Town of Hinton will develop the foundation for an enterprise wide asset management system wit...
Type
MAMP Projects
Sector
Asset Management (MAMP)
Status
Fully Disbursed
Municipality
Township of Rideau Lakes, ON
Sub Sector
Multiple
Project Timeline
2018 - 2019
The Township of Rideau Lakes will develop an Asset Management Policy, as well as implement asset ...
Type
MAMP Projects
Sector
Asset Management (MAMP)
Status
Fully Disbursed
Municipality
Town of Bellburns, NL
Sub Sector
Multiple
Project Timeline
2019 - 2019
The Town of Bellburns will capture all major assets (water distribution, trail and road networks ...
Type
Feasibility Study
Sector
Brownfield
Status
Fully Disbursed
Municipality
Capital Regional District, BC
Sub Sector
Site assessments and remedial action plans
Project Timeline
2018 - 2021
The Capital Regional District (CRD) of Vancouver Island will conduct a detailed site investigatio...
Type
Feasibility Study
Sector
Transportation
Status
Fully Disbursed
Municipality
City of Lethbridge, AB
Sub Sector
Fleet Management
Project Timeline
2018 - 2019
The City of Lethbridge will conduct a feasibility study to assess incorporating alternative fuels...
Type
Feasibility Study
Sector
Energy
Status
Fully Disbursed
Municipality
Corporation of Loyalist Township, ON
Sub Sector
Building – New – Energy efficiency
Project Timeline
2018 - 2019
Loyalist Township will conduct a feasibility study and develop a conceptual design for a net-zero...
Type
MAMP Projects
Sector
Asset Management (MAMP)
Status
Fully Disbursed
Municipality
Town of Battleford, SK
Sub Sector
Asset Management System Assessments
Project Timeline
2018 - 2019
The Town of Battleford will develop an Infrastructure Condition Assessment that will include deta...