Project Type Project Type
Type of initiative Type of initiative
Sector
Province
{vProjStatusDisplayname}}
Project timeline Project timeline
  • to
Population Population
  • to
Project value Project value
  • to
Other

When you click through the individual search result, the database will also highlight the three other initiatives that most closely match your search parameters.

Results

2963 results found. Showing page 178
Type
MAMP Projects
Sector
Asset Management (MAMP)
Status
Fully Disbursed
Municipality
Township of Norwich, ON
Sub Sector
Asset Management System Assessments
Project Timeline
2017 - 2017
Update existing Road Needs Study to include a 20 Year Capital Plan in place of the existing 10 Ye...
Type
MAMP Projects
Sector
Asset Management (MAMP)
Status
Fully Disbursed
Municipality
Village of Silverton, BC
Sub Sector
Data Collection and Reporting
Project Timeline
2017 - 2018
Develop and complete inventory of the municipality's major assets including linear assets (roads,...
Type
MAMP Projects
Sector
Asset Management (MAMP)
Status
Fully Disbursed
Municipality
Communauté régionale de Campbellton, NB
Sub Sector
Data Collection and Reporting
Project Timeline
2017 - 2017
The project consist of developing an asset management plan which will serve as both a strategic a...
Type
MAMP Projects
Sector
Asset Management (MAMP)
Status
Fully Disbursed
Municipality
Township of Clearview, ON
Sub Sector
Multiple
Project Timeline
2017 - 2018
Increase Asset Management Readiness from Levels 1/2 to Levels 3 by:- obtaining asset condition re...
Type
MAMP Projects
Sector
Asset Management (MAMP)
Status
Fully Disbursed
Municipality
Village of Oil Springs, ON
Sub Sector
Asset Management Plans, Policy and Strategy
Project Timeline
2017 - 2018
Work with an engineer firm to lead this project to collect missing data needed (waste water, incl...
Type
MAMP Projects
Sector
Asset Management (MAMP)
Status
Fully Disbursed
Municipality
Municipal District of Bonnyville No. 87, AB
Sub Sector
Multiple
Project Timeline
2017 - 2018
The Asset Management Initiatives Project consists of two initiatives: the enhancement senior mana...
Type
MAMP Projects
Sector
Asset Management (MAMP)
Status
Fully Disbursed
Municipality
Municipality of North Grenville, ON
Sub Sector
Multiple
Project Timeline
2017 - 2018
These projects are designed to improve our asset management data as well as our overall organizat...
Type
Operational Study
Sector
Waste
Status
Fully Disbursed
Municipality
,
Project Timeline
2017 - 2020
The Regional District of Mount Waddington (RDMW) will perform an operational study on one of its ...
Type
Plan
Sector
Climate Change Adaptation
Status
Fully Disbursed
Municipality
,
Project Timeline
2017 - 2018
Surrey coastal floodplains are predicted to experience more flooding events in the future resulti...
Type
Plan
Sector
Climate Change Adaptation
Status
Fully Disbursed
Municipality
,
Project Timeline
2017 - 2019
The Regional Municipality of Waterloo (RMOW) will develop a Community Climate Adaptation Plan to ...