When you click through the individual search result, the database will also highlight the three other initiatives that most closely match your search parameters.
Results
1714 results found. Showing page 164Type
Feasibility Study
Feasibility Study
Sector
Energy
Energy
Status
Fully Disbursed
Fully Disbursed
Municipality
City of White Rock, BC
City of White Rock, BC
Sub Sector
Building – New – with Renewable energy
Building – New – with Renewable energy
Project Timeline
2003 - 2009
2003 - 2009
The city is exploring the feasibility of constructing its new Operations Building as a "green bui...
Type
Feasibility Study
Feasibility Study
Sector
Transportation
Transportation
Status
Fully Disbursed
Fully Disbursed
Municipality
Ville de Montréal, QC
Ville de Montréal, QC
Sub Sector
Transportation Demand Management (TDM)
Transportation Demand Management (TDM)
Project Timeline
2005 - 2011
2005 - 2011
The city wants to reduce automobile traffic and minimize the greenhouse gas emissions city employ...
Type
Feasibility Study
Feasibility Study
Sector
Multi-sector (Plans)
Multi-sector (Plans)
Status
Fully Disbursed
Fully Disbursed
Municipality
City of Burnaby, BC
City of Burnaby, BC
Sub Sector
Sustainable Communities
Sustainable Communities
Project Timeline
2003 - 2009
2003 - 2009
This study will look at ways to design roads so that runoff can be stored during storms and absor...
Type
Feasibility Study
Feasibility Study
Sector
Energy
Energy
Status
Fully Disbursed
Fully Disbursed
Municipality
Ville de Bécancour, QC
Ville de Bécancour, QC
Sub Sector
Building – Existing – Energy efficiency
Building – Existing – Energy efficiency
Project Timeline
2001 - 2011
2001 - 2011
This proposal groups 30 feasibility studies in arenas across Quebec. The studies will assess the ...
Type
Capital Project
Capital Project
Sector
Water
Water
Status
Fully Disbursed
Fully Disbursed
Municipality
Fraser Valley Regional District, BC
Fraser Valley Regional District, BC
Sub Sector
Drinking Water Quality
Drinking Water Quality
Project Timeline
2001 - 2011
2001 - 2011
The Fraser Valley Regional District is developing a water filtration program for Norrish Creek, t...
Type
Feasibility Study
Feasibility Study
Sector
Waste
Waste
Status
Fully Disbursed
Fully Disbursed
Municipality
Ville de Sherbrooke, QC
Ville de Sherbrooke, QC
Sub Sector
Composting
Composting
Project Timeline
2004 - 2011
2004 - 2011
This feasibility study will determine the costs, structures and technology required for the city ...
Type
Feasibility Study
Feasibility Study
Sector
Water
Water
Status
Fully Disbursed
Fully Disbursed
Municipality
Ville de Montréal, QC
Ville de Montréal, QC
Sub Sector
Drinking Water Quality
Drinking Water Quality
Project Timeline
2005 - 2011
2005 - 2011
This study will evaluate the use of magnetic coagulation to treat drinking water at Montreal's tw...
Type
Capital Project
Capital Project
Sector
Water
Water
Status
Fully Disbursed
Fully Disbursed
Municipality
Township of Rideau Lakes, ON
Township of Rideau Lakes, ON
Sub Sector
Wastewater Management and Treatment
Wastewater Management and Treatment
Project Timeline
2007 - 2014
2007 - 2014
The Wastewater Garden technology consists of an ecologically engineered, closed–loop system that ...
Type
Feasibility Study
Feasibility Study
Sector
Waste
Waste
Status
Fully Disbursed
Fully Disbursed
Municipality
MRC de Marguerite-d’Youville, QC
MRC de Marguerite-d’Youville, QC
Sub Sector
Composting
Composting
Project Timeline
2004 - 2011
2004 - 2011
This study will examine the feasibility of providing a collection and composting service for orga...
Type
Pilot Project
Pilot Project
Sector
Waste
Waste
Status
Fully Disbursed
Fully Disbursed
Municipality
Town of Hinton, AB
Town of Hinton, AB
Sub Sector
Landfill Gas Management
Landfill Gas Management
Project Timeline
2002 - 2011
2002 - 2011
This project will study the feasibility of using a methane oxidation cover to cut in half the amo...