When you click through the individual search result, the database will also highlight the three other initiatives that most closely match your search parameters.
Results
1713 results found. Showing page 133Type
Pilot Project
Pilot Project
Sector
Waste
Waste
Status
Fully Disbursed
Fully Disbursed
Municipality
City of Saskatoon, SK
City of Saskatoon, SK
Sub Sector
Landfill Gas Management
Landfill Gas Management
Project Timeline
2007 - 2011
2007 - 2011
The goal of this field test is to enhance landfill gas (LFG) production and collection at the Cit...
Type
Feasibility Study
Feasibility Study
Sector
Water
Water
Status
Fully Disbursed
Fully Disbursed
Municipality
Municipality of Mississippi Mills, ON
Municipality of Mississippi Mills, ON
Sub Sector
Wastewater Management and Treatment
Wastewater Management and Treatment
Project Timeline
2007 - 2009
2007 - 2009
In this project, the Town of Mississippi Mills will conduct an assessment and evaluate alternativ...
Type
Feasibility Study
Feasibility Study
Sector
Energy
Energy
Status
Fully Disbursed
Fully Disbursed
Municipality
City of Brockville, ON
City of Brockville, ON
Sub Sector
Renewable Energy Generation – Other
Renewable Energy Generation – Other
Project Timeline
2006 - 2009
2006 - 2009
The City of Brockville’s population is less than what is usually required (30,000) to make cogene...
Type
Pilot Project
Pilot Project
Sector
Energy
Energy
Status
Fully Disbursed
Fully Disbursed
Municipality
Regional Municipality of Durham, ON
Regional Municipality of Durham, ON
Sub Sector
Building – Existing – Energy efficiency
Building – Existing – Energy efficiency
Project Timeline
2007 - 2011
2007 - 2011
In the first phase of the “Hamlet” development in the Town of Ajax, 100 homes were equipped with ...
Type
Pilot Project
Pilot Project
Sector
Energy
Energy
Status
Fully Disbursed
Fully Disbursed
Municipality
City of Medicine Hat, AB
City of Medicine Hat, AB
Sub Sector
Renewable Energy Generation – Solar
Renewable Energy Generation – Solar
Project Timeline
2006 - 2011
2006 - 2011
This field test involves the installation of up to 25 kilowatts (kW) of grid-connected solar phot...
Type
Feasibility Study
Feasibility Study
Sector
Energy
Energy
Status
Fully Disbursed
Fully Disbursed
Municipality
City of Timmins, ON
City of Timmins, ON
Sub Sector
Building – Existing – Energy efficiency
Building – Existing – Energy efficiency
Project Timeline
2006 - 2011
2006 - 2011
Detailed energy audits will be conducted on 82 City facilities. The information from the audits ...
Type
Feasibility Study
Feasibility Study
Sector
Energy
Energy
Status
Fully Disbursed
Fully Disbursed
Municipality
City of Vancouver, BC
City of Vancouver, BC
Sub Sector
Building – New – Energy efficiency
Building – New – Energy efficiency
Project Timeline
2006 - 2011
2006 - 2011
The City of Vancouver will conduct a feasibility study to assess the incorporation of a highly in...
Type
Plan
Plan
Sector
Energy
Energy
Status
Fully Disbursed
Fully Disbursed
Municipality
Town of Milton, ON
Town of Milton, ON
Sub Sector
Building – New – with Renewable energy
Building – New – with Renewable energy
Project Timeline
2006 - 2011
2006 - 2011
Clean Energy Development (CED) will partner with the Town of Milton, Milton Hydro Distribution, a...
Type
Capital Project
Capital Project
Sector
Energy
Energy
Status
Fully Disbursed
Fully Disbursed
Municipality
City of Peterborough, ON
City of Peterborough, ON
Sub Sector
Building – Existing – Energy efficiency
Building – Existing – Energy efficiency
Project Timeline
2007 - 2011
2007 - 2011
The City of Peterborough, in partnership with the local municipally-owned utility company, Peterb...
Type
Feasibility Study
Feasibility Study
Sector
Energy
Energy
Status
Fully Disbursed
Fully Disbursed
Municipality
Capital Regional District, BC
Capital Regional District, BC
Sub Sector
Renewable Energy Generation – Hydro
Renewable Energy Generation – Hydro
Project Timeline
2006 - 2011
2006 - 2011
The Capital Regional District, comprising the City of Victoria (BC) and surrounding municipalitie...